Norske Skogindustrier AS
Nordenfjelske Treforedling, Skogn, Norway. Installation assistance and follow up on location during the construction of a new recycled paper facility. Full mech and pipe construction for a new recycled paper facility. Bio mass fuel power plant. Planning of fuel management as well as planning a ventilation system for a furnace house. Process schematics, layout, piping and isometric projection.
Metso Paper Karlstad AB
Weyerhaeuser Valiant, USA. Reconstruction of the press section PM2. Installation supervision and coordination of pipe installation.
Infratek
Project Management of a new fibre net in Strömstad.
Holmen Paper AB
Braviken. Facility project planning SO2, Project management and construction. Tank foundation, flow charts and layouts for DIP2. Process schemes, layout, tank and pipe drawings, facility planning for projects DIP2. Hallstavik New packaging with peripherals. Mech and pipe planning rörprojektering together with assembly coordination. Design of new steam central
Freudenberg
Norrkoping. Preliminary planning of new unloading station for carbon disulphide Design in PDMS.
EON ES
Troubleshooting & Support of P13 Händelöverket’s control system Replacing control system of soot blowing furnace 1 (P1 & P3) in Hässelby, Fortum. In cooperation with Autsyde.
E.ON Värme
Project Management at Händelöverket in Norrköping.
BillerudKorsnäs
Frövi mechanical and pipe design in the subjects of caustics, white sodium oxidation and meas drying.
Atlas Copco Industrial Technique AB
Project management and installations for Atlas Copco Tools