Meritor
The purpose of the prestudy, based on assumptions from Lindes management, was to demonstrate the potential for improvement including the benefits of this.
Meritor
OMT worked with:
Targets
- Optimize logistics flow to reach world class regarding stock, lead time and costs
- In assembly, meet the volume requirements in “Key Concept” on 3-shift production
- Presented solutions in the pilot study should support the concept “continuous improvements”
Quality
- MAX 50 PPM for Volvo
Leadtime
- 50% leadtime reduction internally at Lindefactory
OEE
- Assembly 90%
- Processing 85%
Contacts
Business management Board of directors
John Filipiak Wallderin
President, Chairman of the Board and Owner of OMT
+4670-511 01 67
john@omtab.se