OMT AB
Byt språk:
  • Svenska
  • Flertal industrirobotar som i ett led sätter ihop bilar.

    Meritor

    The purpose of the prestudy, based on assumptions from Lindes management, was to demonstrate the potential for improvement including the benefits of this.

    Meritor

    OMT worked with:

    Targets

    • Optimize logistics flow to reach world class regarding stock, lead time and costs
    • In assembly, meet the volume requirements in “Key Concept” on 3-shift production
    • Presented solutions in the pilot study should support the concept “continuous improvements”

    Quality

    • MAX 50 PPM for Volvo

    Leadtime

    • 50% leadtime reduction internally at Lindefactory

    OEE

    • Assembly 90%
    • Processing 85%

    Contacts

    Business management Board of directors

    John Filipiak Wallderin

    President, Chairman of the Board and Owner of OMT

    +4670-511 01 67